Before the crew arrives

    Site-readiness checklist

    Maintenance windows get lost to access, isolation, and ventilation — not to blasting speed. Work through this before the date is locked, print it, and hand it to whoever is on site.

    0 of 41 items confirmed.

    Access and the window itself

    A window only counts if the crew can actually get to the asset for the whole of it.

    Power, air, and utilities

    Confirm what we can draw on before the day, not on the day.

    Ventilation and atmosphere

    CO₂ sublimates to gas and displaces oxygen. This section is not optional and it can stop a job.

    Electrical isolation

    We do not blast energized equipment.

    Protection and containment

    Deciding this in advance is faster and cheaper than doing it twice.

    Substrate and expectations

    The test patch is what turns an estimate into a commitment.

    People, PPE, and site rules

    Blasting is loud and the work area has to be cleared.

    Documentation you want back

    Cheap to produce on the day, impossible to produce afterwards.

    Not sure the job suits the method?

    Run the decision guide first — it covers the contaminants and substrates where another method is the better buy. When you are ready, we will walk the site and put a written scope in front of you.