Applications
Dry ice in action.
Real surfaces, real jobs, every service line. We're documenting verified before/after pairs from live jobs — until then, this is how the work looks on site.
Actual work
Photos from our own jobs
Authentic job photographs, naturally enhanced for clarity without generative changes. Captions describe only what is visible in the frame.

Mobile rig set up on site 
Blasting under a work canopy 
Rig staged beside a trailered boat 
Bed-off chassis work bay 
Frame and crossmembers, overhead view 
Frame rails with road-salt buildup 
Front axle housing and lines 
Rear axle and driveline 
Leaf-spring hanger area 
Spring hanger bracket, cleaned frame 
Aircraft cabin sidewall panels
01 / 05
Service detail →Industrial Equipment Cleaning
ApplicationProduction gearbox housing
Bozeman, MT
18 months of carbonized grease removed in two passes.
ApplicationPackaging conveyor frame
Sioux Falls, SD
Food-residue buildup cleared in place during a 6-hour PM window.
ApplicationInjection mold cavity
Boise, ID
Resin and mold release removed with no measurable substrate loss.
ApplicationStamping press tooling
Billings, MT
Lubricant carbon and metal fines cleared between die changes.
ApplicationMCC electrical cabinet (energized)
Spokane, WA
Dust and contamination removed without de-energizing the panel.
ApplicationPaint line overspray
Fargo, ND
Booth grating and structural steel cleaned to bare metal.
02 / 05
Service detail →Fleet & Heavy Equipment Cleaning
ApplicationClass 8 tractor engine bay
Bismarck, ND
12-month grease load removed in 2.5 hours, decals intact.
ApplicationExcavator undercarriage
Coeur d'Alene, ID
Hard-packed mud and grease cleared for inspection.
ApplicationWheel loader articulation joint
Calgary, AB
Hydraulic oil and grit lifted without damaging seals.
ApplicationReefer trailer underbody
Spokane, WA
Road salt and grime removed; reflective tape preserved.
ApplicationCombine engine compartment
Fargo, ND
Crop dust and grease cleared between harvest passes.
ApplicationVactor truck pump assembly
Boise, ID
Caked product removed in place — back in service same day.
03 / 05
Service detail →Food Plant & Commercial Kitchen Cleaning
ApplicationTunnel oven interior
Sioux Falls, SD
Carbonized sugar and crumb removed without disassembly.
ApplicationCommercial kitchen hood
Bozeman, MT
NFPA 96 cleaning completed during overnight close.
ApplicationWalk-in evaporator coil
Spokane, WA
Iced and contaminated coil restored to design airflow.
ApplicationBakery proofer racks
Boise, ID
Dough and oil residue cleared between production runs.
ApplicationPackaging line frame
Fargo, ND
Allergen changeover documented per SSOP.
ApplicationStainless process tank exterior
Calgary, AB
Product splash and corrosion removed without re-passivation.
04 / 05
Service detail →Fire, Smoke & Restoration Cleaning
ApplicationSoot-coated wood framing
Kalispell, MT
Open-stud cleaning completed in one shift.
ApplicationCharred glulam beam
Coeur d'Alene, ID
Char layer removed; beam preserved for structural eval.
ApplicationSmoke-damaged brick wall
Bozeman, MT
Soot lifted without added process water-driven staining.
ApplicationHVAC ductwork interior
Spokane, WA
Smoke and soot cleared from supply trunks.
ApplicationSubfloor framing
Fargo, ND
Smoke residue removed prior to encapsulation.
ApplicationStructural steel column
Boise, ID
Char removed; column inspected and returned to service.
05 / 05
Service detail →Automotive & Specialty Surface Cleaning
Application1969 small-block engine bay
Kalispell, MT
Concours prep — labels and markings preserved.
ApplicationModern dealer recon engine bay
Boise, ID
60-minute turnaround for sales-floor presentation.
ApplicationRestoration teardown chassis
Spokane, WA
60 years of grease and grime cleared for inspection.
ApplicationIndependent rear suspension
Bozeman, MT
Bushings and hardware cleaned in place.
ApplicationBarn-find frame
Calgary, AB
Initial evaluation cleaning before restoration scope.
ApplicationUsed-truck recon undercarriage
Fargo, ND
Volume contract — 6 trucks/day pace.
