Winter 2026–27 rates. No theater.
Flathead Valley: 2 hrs $800 + $250 mobilization · 4 hrs $1,400 · 8 hrs $2,400 · Outside the valley: $350/hr plus travel, 1-day minimum.
Dry ice blasting in the Flathead Valley
- $8002-hour rapid deploymentplus $250 mobilization · Flathead Valley only
- $1,4004-hour half daymobilization included · Flathead Valley
- $2,4008-hour full daymobilization included · Flathead Valley
Outside the Flathead Valley
- 1-day minimum
- Travel itemised on your written quote
- Scope confirmed in writing before the job
Final quote confirmed after a site walk or photos; surface compatibility, access and ventilation confirmed before the job.
In the Flathead Valley: 2-hour rapid deployment is $800 plus $250 mobilization; a 4-hour half day is $1,400 and an 8-hour full day is $2,400, mobilization included. Outside the Flathead Valley: $350 per hour plus travel, with a 1-day minimum. Final quote confirmed after a site walk or photos; surface compatibility, access and ventilation confirmed before the job.
Every written estimate confirms travel and mobilization, dry ice, access, ventilation and CO₂ controls, isolation, containment, teardown, site controls, exclusions, and the total.
Full Rate Card
Written estimateRates, travel and written estimates
Why customers pay these rates and renew
We walk the assets with you before quoting, then send a written scope so there is no ambiguity about what is and isn't included.
We run a test patch on the actual substrate before committing to the full job, so you can see the result before we proceed.
We work inside your maintenance window, subject to site access and ventilation requirements — not the other way around.
Every job closes with a photo record and a time log, so you have documentation on file for your own records.
Need a custom scope?
Send photos, the site address and a few details. We confirm the details and follow up with a written estimate.
