Summit Cryo publishes its dry ice blasting rates below. The hour count is rarely the whole story. Buyers who only compare hourly rates almost always misjudge the real number, because dry ice blasting is priced as an outcome (a cleaned asset, with documentation, with no secondary mess to clean up) rather than as a unit of labor. This guide walks the full cost stack, the four variables that actually move the price, what a budget should look like by job type, how to read an apples-to-apples quote, and when buying your own blaster makes more sense than hiring.
Summit Cryo published rates
We publish our rates because the alternative — opaque pricing — wastes everyone's time. These numbers are the starting point for every quote; the variables below explain where a real quote can land above or below them.
- 2-hour rapid deployment: $800 plus $250 mobilization (Flathead Valley only)
- 4-hour half day: $1,400, mobilization included
- 8-hour full day: $2,400, mobilization included
- Outside the Flathead Valley: $350 per hour plus travel, 1-day minimum
Final quote confirmed after a site walk or photos; surface compatibility, access and ventilation confirmed before the job.
What changes the price
- Time on site — which rate fits depends on how many hours the scope takes.
- Travel outside the Flathead Valley — billed hourly plus travel, with a 1-day minimum.
- Access — lifts, confined spaces, permits and after-hours windows add scope time.
- Containment — food zones, occupied buildings and sensitive areas can need extra containment.
- Surface type — the substrate and buildup decide whether dry ice is compatible and how long the job runs.
Related pages: Dry ice blasting services · Dry ice blasting in Kalispell, MT
What's included in the rate
Crew labor, blaster, compressor, dry ice supply for the booked window, PPE, containment plastic for typical industrial environments, before/after photo documentation, and a completion report. Mobilization is listed with each rate above; outside the Flathead Valley, travel is itemised on the written quote. The only line items that are quoted separately and called out up front are: extra dry ice for outlier-consumption jobs, food-zone or clean-room containment beyond the standard kit, lift or scissor rental when we can't bring our own, hot-work permits, and after-hours premium when the customer requires off-shift work outside an already-scheduled window.
The four variables that move the number
- Pellet consumption — heavier contamination uses more pellets per square foot. Most jobs land near the published rate; soot at scale, carbonized grease, or thick pitch on logging equipment can push pellet use to 1.5–2× a normal job and we flag that at quote time.
- Site access — confined spaces, scissor lifts, hot-work permits, after-hours work, and tight LOTO procedures add scope hours rather than pellet cost. A panel that takes 30 minutes in an open shop can take two hours inside a live cabinet room with an electrician on standby.
- Containment — food zones, occupied buildings, clean rooms, and active food-plant lines need extra plastic, HEPA negative-air, and sometimes a tent. We quote those line items separately so you can see them.
- Travel — inside the Flathead Valley the 2-hour, half-day and full-day rates apply; outside it, work is billed at $350 per hour plus travel with a 1-day minimum, and travel is itemised on the written estimate.
Typical job sizes
Most jobs fit one of the published rates once we know the time on site. Every job gets a written quote.
- Commercial kitchen deep clean (hood plenum, ovens, fryer battery): typically a half day to a full day on site, off-hours.
- Vehicle undercarriage or chassis cleaning: typically a few hours to a half day per vehicle in the customer's shop.
- Electrical cabinets or motors with LOTO coordination: scoped by cabinet count; multi-cabinet visits usually run a half day or more.
- Heavy-equipment degreasing at a customer yard: scoped by unit count, often batched into a full day.
- Soot removal after a fire: scoped against the GC's containment plan; larger losses run multiple days.
- Food-plant line, conveyor, oven and mixer cleaning: scoped to the sanitation window.
How dry ice compares to other methods on a per-job basis
Hourly, dry ice can look expensive next to pressure washing and abrasive blasting. On a per-asset basis, dry ice usually closes most or all of the gap because of what it doesn't require: disassembly, water containment, dry-down time, decal re-application, electrical isolation, secondary waste disposal, and rework when something corrodes the following week. For carbonized contamination on painted, sensitive, or food-contact surfaces, dry ice is frequently the cheapest option once the full job — not just the cleaning step — is costed honestly.
Side-by-side breakdown vs. pressure washing, sandblasting, soda blasting, chemical degreasers, steam, hand scrubbing, and ultrasonic — including the scopes where dry ice isn't the right answer.
See the full method comparisonWhat a real cost comparison looks like
Take an electrical cabinet with several years of carbon dust and oil mist. Pressure washing isn't on the table — water and energized bus bars don't mix. Solvent wiping is two operators for half a day, several gallons of cleaner, hazardous waste pickup, and a re-clean six months later because the loosened contamination resettles inside the enclosure. Dry ice on the same cabinet is one operator for 60–90 minutes, vacuum-assisted capture of the dislodged contamination, no added media waste stream, and an IR scan-friendly result. The dry ice quote is sometimes higher than the wipe-down labor line, but lower than the all-in number after solvent, disposal, and downtime are included.
Regional cost factors across our footprint
What changes market to market is distance. Flathead Valley jobs use the 2-hour, half-day and full-day rates. Everywhere else — Spokane, Billings, Bismarck and the rest of the footprint — is $350 per hour plus travel with a 1-day minimum, with travel itemised on the written estimate. Routing several stops on the same trip is how multi-site customers keep the travel share down.
When to ask for a recurring route
If you have more than four predictable jobs a year, ask for a recurring program. We hold a fixed day on the calendar and route multiple stops on the same mobilization, which spreads travel across sites; the resulting rate is scoped and confirmed in writing per site and cadence. Fleets, food plants, HVAC programs, and municipal contracts typically run on this model. The administrative win is just as important: one PO, one route plan, one set of safety paperwork that gets reused, and a single point of contact who already knows your equipment.
Buy a blaster vs. hire a mobile service
We get this question every month. The breakeven is real and it's not where most buyers expect. A capable industrial dry ice blasting setup — blaster, 185+ CFM compressor, hoses, nozzles, PPE — is $35,000–$80,000 in equipment alone, before dry ice handling, training, maintenance, and an operator's labor. Most buyers should not own the equipment unless they're doing more than ~150 blasting hours per year, have someone whose job already includes operating compressors, and can store and consume dry ice fast enough to avoid sublimation losses. Below that threshold, hiring on a route is meaningfully cheaper and faster to deploy. See the longer breakdown in our buy-vs-hire guide for the full math.
How to read an apples-to-apples quote
- The hourly rate or project total, with the applicable minimum stated clearly
- Whether dry ice is included or billed separately
- Whether travel and mobilization are itemised for your address, and which service zone it falls in
- Containment, lift, and after-hours premiums called out as separate line items
- Documentation deliverable named (per-asset photo log, Xactimate-ready packet, SSOP-keyed photo log)
- Insurance, MSHA / OSHA, and food-safety credentials referenced where relevant
How to get an accurate quote from us
Photos and a rough scope — surface, buildup, square footage, access, and timing — are enough for a written quote in most cases, usually back to you the same day. For larger jobs, first-time accounts, or anything inside a live food plant or energized electrical room, a 30-minute site walk almost always pays for itself in scope accuracy; we confirm any site-walk cost in the written quote. We'd rather walk a site and bid the right number than under-scope a job and ask for a change order later.
Send photos and a rough scope, or book a site walk. We confirm surface compatibility, access and ventilation, then send a written quote.
Request a quote or site walk